{"id":6597,"date":"2014-08-28T15:50:46","date_gmt":"2014-08-28T20:50:46","guid":{"rendered":"https:\/\/greenbugenergy.com\/?page_id=6597"},"modified":"2022-05-30T12:24:45","modified_gmt":"2022-05-30T17:24:45","slug":"micro-hydro-glossary","status":"publish","type":"page","link":"https:\/\/greenbugenergy.com\/micro-hydro-glossary","title":{"rendered":"Glossary"},"content":{"rendered":"\t\t
The amount of electricity used by a consumer in one year, typically measured in kilowatt-hours (kWh). <\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t Method of flow measurement using a bucket of known volume and a stopwatch. <\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t Is a measure of the \u201cfull power\u201d capacity utilization of the turbine.<\/span><\/p> = actual kwh\u2019s produced or expected annually<\/span><\/p> kwh\u2019s produced or expected if turbine were at \u201cfull power\u201d 100% of the time.<\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t The quantity of CO2 emissions saved through the production of renewable electricity compared with grid electricity derived from fossil fuel sources.<\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t Climate change refers to any significant change in measures of climate (such as temperature, precipitation, or wind) lasting for an extended period (decades or longer). <\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t The rate of flow of electrons through a circuit;measured in Amps. The amount of current depends on voltage (consider it the same as pressure) and on the resistance of the material it is passing through.<\/span><\/p> Power (apparent) = Volts x Amps <\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t This is selected by the designer by taking careful account of all project constraints.<\/span><\/p> Flow availability which has been determined by site survey and catchment study is the initial constraint. Typically, a value of Qmean (i.e. average annual flow ) or lower is used as the design flow rate. As a first estimate of site viability, Qmean can be used if an accurate historical value can be established. If no turbines are available because Qmean is too high, then reduce the value of the design flow rate in 10% steps until a suitable system is identified. Further factors affecting the design flow rate include:<\/span><\/p> –\u00a0 <\/span>Environmental constraints (e.g. \u2018hands off\u2019 flow and\/or flow split requirements)<\/span><\/p> – Grid connection constraints relating to the power export limit.<\/span><\/p> –\u00a0 <\/span>Magnitude of user loads (\u201coff-grid\u201d schemes)<\/span><\/p> –\u00a0 <\/span>Project finance and ROI requirements<\/span><\/p> Power (apparent) = Volts x Amps <\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t The depleted reach (of the river) is the length of the river between intake to the leat and where the water re-enters the river. <\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t A term used to describe localized or on-site power generation. <\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t Wiring system which connects houses to the generator. <\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t The word used to describe how all the power is converted from one form to another; it is the ratio of the output power to the input power expressed as a percentage; the efficiency of a pico hydro system is usually about 45%.<\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t The capability of doing work; different forms of energy can be converted to other forms, but the total amount of energy remains the same.<\/span><\/p> Energy = Power x period for which power is used.<\/span><\/p> kWh = Power in kW x hours for which power is used or produced.<\/span><\/p> Example: 1 Kilowatt hour = 1000 watts produced or consumed for one hour of time.<\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t An independent regulatory agency within the U.S. Department of Energy that has jurisdiction over interstate electricity sales, wholesale electric rates, natural gas pricing, oil pipeline rates, and gas pipeline certification. It also licenses and inspects private, municipal, and state hydroelectric projects and oversees related environmental matters. <\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t A policy mechanism designed to accelerate investment in renewable energy technologies. It achieves this by offering<\/span><\/p> 1. a way for people to legally connect a generator and sell power to the grid<\/span><\/p> and by<\/span><\/p> 2. offering long-term contracts for renewable energy producers.<\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t A feed-in tariff is simply a guaranteed price set by the government for anyone who wants to sell renewable electricity to the grid, and a guarantee that they will have access to the grid to do so.<\/span><\/p> The price, or tariff, is set so that a modest profit is ensured, thereby unleashing the collective capital resources of the entire province, state or country to be part of the transition to renewable energy.<\/span><\/p> Feed-in tariffs exist in more than 20 countries. They are the most common policy for encouraging renewable energy systems, in part because \u201cfeed-in mechanisms achieve larger deployment at lower costs\u201d than other policy mechanisms such as quotas, direct incentives or voluntary goals.<\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t Measurement of the quantity of water flowing past a point in one second; measured in cubic meters per second or liters per second and used to calculate the hydraulic power. (Note: One cubic meter per second = 1000 liters per second.)<\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t The volume of water passing a point in one second, measured in cubic metres per second or in litres per second if using metric units. One thousand litres per second is equal to one cubic metre per second therefore 50 l\/s = 0.05 m3\/s, for example.<\/span><\/p><\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t