
Dare Mighty Things
project case studies.
Browse through our project case studies and get inspired.
micro hydro projects.

Site No. 2FC59 – 2017
Name: VanTol Weir
Maximum Output: 35 kW
Maximum Design Flow Capacity: 1.65 cubic meters per second
Design Head: 3.7 Meters

Site No. RI03801
Name: Natick Pond Dam
Watercourse: Pawtuxet River
Maximum Output: 360kw(estimated)